A waste management company has been contracted by local construction company to remove construction waste from three of its local construction sites. The charges for each site include a standard charge (S) of £300 for removing the waste, together with additional labour costs (L) of £80 per operative (for sorting the waste ready for recycling) and a hire cost for the number of site bins (B) they supply at £10 per bin.
_________________________________________
[url=http://www.amts.com/]analytical testing[/url] | [url=http://www.amts.com/]process piping certification[/url] | [url=http://www.amts.com/]laboratory[/url]
_________________________________________
[url=http://www.amts.com/]analytical testing[/url] | [url=http://www.amts.com/]process piping certification[/url] | [url=http://www.amts.com/]laboratory[/url]



